Installation

Installation considerations

• Do the mechanical installation tasks first, the electrical installation tasks second, and the plumbing

installation tasks last.

• All fittings are designed to be tightened by hand only.
• The panel is designed to be wall or rack mounted. Mount or position the panel in an accessible

location.

• Do not place the panel next to a heat source.
• Do not mount the panel in an environment with frequent vibrations
• Do not mount the panel in direct sunlight.
• Install the panel indoors or in an environmental enclosure.
• Prevent condensation from collecting on the panel and panel components, especially the flow cell,

sensor and where the sensor and cable connect.

• Use Teflon

®

or PVDF linear low-density polyethylene tubing for the sample supply line and keep

the tubing as short as possible to minimize lag time.

• Sample pressure must be sufficient to keep a continuous water supply to the sensors. An LED

indicator on the flow sensor will be lit as long as the flow is sufficient.

• Keep the flow rate as constant as possible for best sensor operation.

Sample line guidelines

Select a good, representative sampling point for the best instrument performance. The sample must
be representative of the entire system.
To prevent erratic readings:

• Collect samples from locations that are sufficiently distant from points of chemical additions to the

process stream.

• Make sure that the samples are sufficiently mixed.