Mechanical installation, Mount the panel – Hach-Lange CLT10 sc User Manual

Page 9

Advertising
background image

• Make sure that all chemical reactions are complete.

Mechanical installation

Mount the panel

Figure 5

shows the mounting dimensions. Refer to the figure and follow the steps to mount the panel.

1. Attach mounting screws to the mounting surface. Mount on wall studs or use wall anchors. Leave

enough room between the head of each screw and the mounting surface so the panel will fit in
between.

2. Slide the panel mounting holes over the heads of the mounting screws and allow the panel to

slide down until the top of each mounting hole rests on the screw body.

3. Tighten each screw to secure the panel to the mounting surface.
4. Install the chlorine and pH sensor (optional) in the flow cells. For information on how to install a

sensors, refer to the sensor user manual.

Figure 5 Reagentless chlorine analyzer panel dimensions

English 9

Advertising
This manual is related to the following products: