Connect the sample stream, Startup, Set the power to on – Hach-Lange WPC-22 User Manual

Page 12: User interface and navigation, User interface

Advertising
background image

Connect the sample stream

Install the sample line into a larger process pipe to minimize interference
from air bubbles or pipeline bottom sediment. A sample line that goes
into the center of a process pipe is best.

Figure 7

shows examples of good and bad methods of sample line

installation into a process pipe.
Keep the sample line as short as possible to decrease analysis delay.
Sediment can collect in long sample lines.

Figure 7 Sampling methods

1 Air

2 Sample flow

Startup

Set the power to on

1. Connect the power cord to an electrical outlet with earth ground.
2. Open the enclosure door. Loosen all four captive screws that attach

the enclosure door.

3. Set the power switch to on.

4. Close the enclosure door. Tighten all four captive screws that attach

the enclosure door.

User interface and navigation

User interface

Figure 8

shows the display, keypad and indicator lights. Refer to

Table 6

for key descriptions. Refer to

Table 7

for indicator light descriptions.

Figure 8 User interface

1 Alarm light

5 Power light

2 F1 key

6 ENTER key

3 START/STOP key

7 F2 key

4 Display

8 Sensor light

12 English

Advertising
This manual is related to the following products: