Section 5 start up, 1 starting up – Hach-Lange LT 200 Thermostat User Manual

Page 60

Advertising
background image

59

Start up

Section 5

Start up

5.1 Starting up

Place the thermostats on a stable, level,
heat-resistant surface.

Plug one end of the power supply into the back
of the thermostat, below the power switch, and
plug the other into an earthed mains power
socket (115/230 Volt +5%/-15% / 50/60 Hz).

Switch on the thermostat by pressing the power
switch on the back.

Note: Do not switch the instrument off and on in rapid
succession. Always wait about 20 seconds before
switching the instrument on again, otherwise you may
damage the electronic and mechanical systems.

The first time the instrument is turned on, the
language selection screen will appear
(

section 5.5 on page 66

).

After initialization the instrument is ready for
operation.

Advertising