D250s dual – CTEK SMARTPASS User Manual

Page 5

Advertising
background image

EN

 EN • 7

wiring system; or an equipment-grounded conductor should

be run with circuit conductors and connected to equipment-

grounded terminal or lead on battery charger. Connections

to battery charger should comply with all local codes and

ordinances.

D250S DUAL

The D250S Dual has 2 inputs. The Service battery will be

charged from the alternator, solar panel, or both in combina-

tion. The solar panel adjusts itself to the Starter battery voltage.

The Starter battery will be charged and maintained directly by

the solar panel if the Service battery is fully charged.

D250S DUAL

FEATURES:

• Multi-step 20 A temperature compensated battery charging

and battery maintenance.

• Battery separation of Starter and Service batteries.

• Maximum power point tracking for solar panels charging

the Service battery.

• Two power source inputs (alternator, solar, wind, Supply

battery and other).

• Coordination of the two inputs, allowing parallel operation.

• The solar input will also maintain the Alternator battery.

• Built in battery guard for the Alternator battery.

D250S DUAL

12V

+OUT

+IN

+IN

Temperature sensor

L:2 m/6,5 feet

Service

battery +

Alternator

battery +

Solar panel +

Vehicle ground/

Solar panel –

Advertising
This manual is related to the following products: