Warning, Operator setup – Controlled Products Systems Group BGU-12-311 User Manual

Page 8

Advertising
background image

BGU

• BGU-D Barrier Gate Operator Installation Guide

- 6 -

P558 Revision X13 8-11-2011

Operator Setup

Controller Access

The Controller in models BGU and BGU-D is located under
the operator’s top cover.

To access the Controller, from inside the operator, fl ip the
two cover release latches up to unlock the operator’s top
cover. Remove the cover to expose the Controller.

The Controller is protected by a plastic dust cover. To
remove the dust cover, loosen the cover’s wing-screw and
lift the cover off.

AC Power Connection

All Linear gate operators are supplied with a power
disconnect switch to turn on and off the power available to
the operator (see Figure 8). Following wiring specifi cations
on Page 2, incoming power should be brought into the
operator and connected to the labeled pigtails from the
disconnect box.

NOTE: FOR SOLAR POWERED UNITS ONLY: The

APeX Controller’s AC power disconnect switch does not
turn off the Apex DC power when connected to solar
panels. It will however, disconnect DC motor power.
Unplug the solar panel input on the front of the Apex
Controller prior to servicing the unit.

Proper thermal protection is supplied with the operator. The
motor contains a thermal overload protector to guard from
overheating the motor due to overload or high-frequency
operation. To reset the motor after an overload, press the
red button on the end of the motor after the motor has
cooled down.

Earth Ground

Install a ground rod and connect it to the operator’s frame
in every gate operator installation. A good earth ground is
necessary to allow the Controller’s built-in surge and lightning
protection circuitry to work effectively. The physical bolting
of the operator to the mounting pad is not suffi cient for
a good earth ground.

NOTE: Do not splice the ground wire. Use a single piece of solid

copper 12 AWG wire between the ground rod and the operator.

1. Install an 8-foot long copper ground rod next to the operator mounting

pad within three feet of the operator.

2. Use a clamp to connect a solid copper 12 AWG ground wire to the

ground rod.

3. Route the ground wire to the operator.

4. Connect the ground wire to the operator’s frame.

COVER

RELEASE

LATCH

Figure 7. Cover Release Latch

Figure 8. Power Disconnect Box Wiring

CONNECT AC POWER

PIGTAIL LEADS TO

AC POWER SOURCE

115 VAC WIRING
GREEN - GROUND
BLACK - HOT
WHITE - NEUTRAL

230 VAC WIRING
GREEN - GROUND
BLACK - HOT
WHITE - HOT

SERVICE OUTLET

ON 115 VAC UNITS

ONLY

WARNING

ALL AC ELECTRICAL CONNECTIONS TO THE POWER SOURCE AND
THE OPERATOR MUST BE MADE BY A LICENSED ELECTRICIAN AND
MUST OBSERVE ALL NATIONAL AND LOCAL ELECTRICAL CODES.
POWER SUPPLY MUST BE OF CORRECT VOLTAGE AND PHASE.

WARNING

Always disconnect power from operator before servicing.
Always keep clear of gate arm during operation.

Advertising
This manual is related to the following products: