Daily shut down checklist innovator pro, Activity – Magnum Venus Plastech INNOVATOR PRO 5000 (8003) User Manual
Page 37

MAGNUM VENUS PLASTECH
Innovator Pro Manual
37
DAILY SHUT DOWN CHECKLIST
INNOVATOR PRO
ACTIVITIES MUST BE DONE IN THE SEQUENCE SHOWN, AND MUST BE TICKED
OFF AS COMPLETED. THIS SEQUENCE FOLLOWS ON FROM “DAILY START UP
CHECKLIST”
ACTIVITY
NO.
ACTIVITY
TICK WHEN
COMPLETED
Priority
Put on Respirator as specified for spray painting, Protective
Clothing, Eye Protection, and PVC Gloves
1
Press the Stop button to Close the injection head, TAS (Turbo
Autosprue) or pinch injection hose to close the mould
2
Press the Reset button on the Counter to reset the counter.
3
Flush the injection head and hose or TAS (Turbo Autosprue)
4
Disconnect the injection hose or TAS from the injection head.
5
Turn off the main air slide valve at the back of the unit.
ABNORMAL CONDITIONS OBSERVED AND CORRECTED
Abnormal Condition
a
a
a
a when
corrected
OPERATORS NAME
__________________________________
DATE:
_______________
SIGN OFF WHEN SHUT DOWN CHECKS ARE COMPLETED:
__________________________