Requirements, Air requirements, Tool and supplies requirements – Magnum Venus Plastech Pro Series VPRO-45220 22:1 & 7:1 User Manual

Page 17

Advertising
background image

VPRO-45220 Series Resin Pump Manual

Rev. 11/2013

Page | 17

Requirements:

Air Requirements:

Clean, dry compressed air must be available at up to 90 psi (6.3 kg/cm

2

) and a minimum volume

of 10 CFM (0.3 m

3

). Air must be provided through an air hose with a diameter of 0.5 inch (1.3

cm) or greater.

Tool and Supplies Requirements:

When performing service and repair on the Pro Pump, you should have the following tools,
spare parts and supplies available before beginning.

NOTE: Items followed by a * may be purchased from Magnum Venus Plastech.

One table vise

Loctite™ 243 (removable) or equivalent thread lock compound

One small hammer

Needle-nose pliers

Solvent or emulsifier for cleaning

One clean work table

Anti-seize thread sealant

Set of hex wrenches * (08469)

One 5/8-inch wrench * (08474)

One 9/16-inch wrench * (08476)

One 5/16-inch wrench * (08477)

Empty buckets for cleaning

Clean ¼-inch plastic dowel or rod

One 8-inch adjustable wrench * (08467)

One 12-inch adjustable wrench * (08468)

One 7/16-inch open-end wrench

One ½-inch socket wrench

One 7/16-inch socket wrench * (08472)

Wooden sticks or tongue depressors (for testing)

Advertising