Installation, Exhaust side wall venting – Fulton VMP Hot Water (VMPW) User Manual

Page 21

Advertising
background image

Questions? Call (315) 298-5121, or visit us online at www.fulton.com

SECTION 2

VMPW-IOM-2012-1001

INSTALLATION

2-15

Roof

Minimum

6' Above

Any Structure

Within 30'

Support As

Necessary

Install
Appropriate
Weather
Cap

Horizontal
Run 2'

Draft Regulator
(If Necessary)

Draft Regulator
(If Necessary)

Expansion Joints
As Required

Horizontal
Run 2'

60¡

(45¡ Min.)

Cleanout

Door

Cleanout

Door

Cleanout

Door

This Distance
Must Not
Exceed 70%
Of Total Rise

Baffle

3'

3'

30¡

Max

Stagger

Entrances

A

A

A-A

Total

Rise

FIGURE 2 - TYPICAL STACK ARRANGEMENT

9. Concentration levels of only a few ppm of chlorine

containing compounds in combustion air can produce
serious corrosion of the fl ue over long periods of time.
High chlorine containing compounds such as carbon
tetrachloride or perchloroethylene would be prime
suspects.

Exhaust Side Wall Venting

Boilers for which sidewall venting (Figure 4) may be utilized
are propane, natural gas, or combination propane and natural

gas sizes 10 to 30 HP.

Adhere to the following for installations requiring sidewall
venting:

1. Flue vent piping must be pitched upward at ¼ in (6.35

mm) per one foot (3.048 m) of length.

2. An UL-approved draft fan must be installed to provide

suffi

cient draft (-0.02 to -0.04” wc) to safely vent

products of combustion.

Advertising