Installation, End view, Typical roof penetrations – Fulton Caliber (CAL) Condensing Hydronic Boiler User Manual

Page 29: Figure 11 - wall thimble installation, Figure 12- roof penetration details

Advertising
background image

Questions? Please Contact Your Local Manufacturer’s Representative

SECTION 2

CAL-IOM-2014-0129

INSTALLATION

2-23

DIAMETER "C"

STAINLESS

3 1/2 IN. OR

4.35 CM

AIR GAP

ALL AROUND

THRU PIPE

VARIABLE

(3 1/4 IN. MIN.) - (20 IN. MAX.)

(8.255 CM MIN. - 50.8 CM MAX.)

DIAMETER "B"

ADJUSTABLE

WALL THUMBLE

WIDTH TO VARY WITH

WALL THICKNESS

DIAMETER "A"

COLLAR

END VIEW

SCREW OR BOLT EACH THUMBLE COLLAR

TO WALL (TYPICAL 4 PLACES) ORIENT

COLLAR AND CLAMPS AS REQUIRED

PIPE RETAINING
CLAMP, TYPICAL
EACH SIDE

FIGURE 11 - WALL THIMBLE INSTALLATION

ROOF

SUPPORT

WIRES AND INSULATION

TO COMBUSTABLES,

AIR SPACE CLEARANCES

MAINTAIN MIN 9" / 22.86 CM

NOTE:
AIR INTAKE AND EXHAUST TERMINATION
SHOULD BE SEPERATED AS FAR AS POSSIBLE
TO PREVENT FLUE GAS RECIRCULATION
DURING DIFFERENT WIND CONDITIONS.

4FT / 122 CM

(MINIMUM)

FLASHING

ADJUSTABLE

4" PVC PIPE

FLASHING

ADJUSTABLE

ADHESIVE SEAL

STORM COLLAR

EXHAUST STACK IS DOWNWIND

OF AIR INTAKE OPENING

SCREENED INLET

4FT / 122 CM ABOVE AIR INTAKE PIPING

WHEN WITHIN 10 FT HORIZONTALLY

METAL PLATE

FIRE STOP

DO N OT PLACE
INSULATION
IN REQUIRED AIR
SPACE CLEARANCE

TYPICAL ROOF PENETRATIONS

( SUGGESTED TERMINATION CONFIGURATIONS )

IF SNOW ACCUMULATION
IS APPLICABLE, OPENING
TO BE 1 FT. / 30 CM ( MIN. )
ABOVE THIS NORMALLY
EXPECTED LEVEL.

FIGURE 12- ROOF PENETRATION DETAILS