Securitron iMXDa_iEXDa_CH INSTALLATION User Manual

Page 2

Advertising
background image

P/N 500-22155

Page 2

Rev. A, 11/12

5. INSTALLATION INSTRUCTIONS
Pre-Installation Survey
A site survey should be performed to determine the mounting location based on the following:

 Physical strength of mounting areas should meet or exceed the holding force of the

iMXDa/iEXDa.

 Routing of the lock wiring for protection from damage due to intrusion or vandalism.

 Door clearance should be considered to prevent a safety hazard.

Because of the lock system’s internal sensing, alignment between the lock face and strike are

vital for proper operation.
Additional brackets may be required for proper installation. (See Section 7 - Specialized
Mounting Brackets
).

Mounting Configuration
Figure 2
illustrates a common installation on out-swing doors (IMXDa shown). The lock housing

mounts to the header near the corner opposite the door hinge side. The unit may be mounted
horizontally or vertically.

Figure 2

5.1. PHYSICAL INSTALLATION
Install the strike plate before installating the lock housing. Figure 3 illustrates typical strike

mounting for the iMXDa. (For the iEXDa the SB-MXD Sex Bolt, cap, and steel washer shown
here are replaced with a standard sex bolt).

Figure 3


The following tips are important for a successful install:

Strike Plate

1-3 Rubber

Washers

Roll

Pin

Strike Mounting

Screw

Strike Bushing

Door Frame

& Stop

Sex Bolt & Strike

Mounting Screw

Door Frame & Stop

Rubber Washers

Door

Strike Plate

Mounting Bracket

& Hardware

Lock Housing

SB-MXD Sex Bolt

(iMXDa)

Steel

Washer

Actuator

2X Actuator

Mounting Screws

& Dress Plugs

SB-MXD Cap

SFP (Not Included)

Standard Sex Bolt

(iEXDa)

Advertising