Vanguard ATRT-01 S2 User Manual

Page 30

Advertising
background image

ATRT-01 S2, ATRT-01B S2, AND ATRT-01D S2 USER’S MANUAL

REV 2

26

The Phase A test results will be displayed on the LCD screen when testing has finished:

Press the

[ENTER]

key to continue.

g. The following screen will be displayed showing the Phase B cable connections for the

selected test:

Make the cable connections per the instructions and then press the

[START]

key to

run the Phase B test.

h. The following screen will be displayed while the test is being performed:

The Phase A and B test results will be displayed on the LCD screen when testing has
finished:

Line 1 of the results shows the Phase A test results, and line 2 shows the Phase B test
results.

Press the

[ENTER]

key to continue.

i. The following screen will be displayed showing the Phase C cable connections for the

selected test:

Make the cable connections per the instructions and then press the [START] key to run
the Phase C test.

CABLE PHS-C XFMR

X1,X2 to X3,X0
H1,H2 to H3,H2
“START” TO RUN TEST

RATIO mA % DIFF
+15.003 001 0.02
+15.015 001 0.10

“ENTER” TO CONTINUE

DYN 1 TRANSFORMER


PLEASE WAIT...

CABLE PHS-B XFMR
X1,X2 to X2,X0
H1,H2 to H2,H1
“START” TO RUN TEST

RATIO mA % DIFF
+15.003 001 0.02

“ENTER” TO CONTINUE

Advertising