13 print test plan status display, Figure 67.0, Print test plan status display – Vanguard Tri-Phase User Manual
Page 103

TRI-PHASE OPERATING™ INSTRUCTIONS
103
17.13 Print Test Plan Status Display
PRINT TEST PLAN
NUMBER:
Figure 67.0 Print Test Plan Status Display
a. Description: Allows the operator to enter the test plan to be printed. The test plan header
information will be printed.
b. Origin: From the “Test Plan Menu” (Figure 60.0) select menu option 4. Selection of 4 may
be made by turning the Control Knob. Push down the Control Knob after option 4 is
selected.
c. Action Options: Enter the test plan number and then press “ENTER” or push down the
Control Knob.
d. Action To Perform: Press key number 1 then press “ENTER” or push down the Control
Knob.
NOTES:
If test plan 1 does not exist, then use any test plan number the operator chooses to print.
The “Main Menu” is displayed on the LCD after step d is performed.