8 load test plan with thumb drive menu, Load test plan with thumb drive menu, Figure 84.0 – Vanguard Tri-Phase User Manual
Page 128: Load test plan number with thumb drive menu
Advertising
TRI-PHASE OPERATING™ INSTRUCTIONS
128
25.8 Load Test Plan With Thumb Drive Menu
1.INTERNAL STORAGE
.
2.THUMB DRIVE
Figure 84.0 Load Test Plan Number With Thumb Drive Menu
a. Description: Allows the operator to load a test plan from either the internal memory or
from the thumb drive.
b. Origin: This menu is displayed after the operator selects menu option 1 (“Load Test Plan”)
from the “Test Plan With Thumb Drive Menu” (Figure 81.0).
c. Action Options: To load a test plan from internal memory press key number 1 or push
down the Control Knob. To load a test plan from the thumb drive press key number 2.
Selection of number 2 may be made by turning the Control Knob to 2 and pushing down
the Control Knob after number 2 is selected.