Ramsey Winch H-930R DOW-LOK w/Air Shifter for Szummar User Manual

Page 18

Advertising
background image

Cable Tensioner Overhaul

1. Disconnect the air supply from the cable tensioner at the

“T” fitting (item #80). It is not necessary to remove the
tensioner bracket and spacer from the frame angles to
replace the tensioner bar or actuators.

2. Remove nuts (item #69) from actuators (item #82) that

hold the actuators to the tensioner assembly (item #2).
Remove pin (item #26) by removing cotter pin (item
#78) and washer (item #76) on both sides.

3. Remove the tensioner assembly (item #2) and inspect

the actuators for damage.

4. Remove and replace any damaged parts. Tighten cap-

screws (item #49) that attach tensioner bar (item #6) to
tensioner assembly to 30 ft.-lbs (41 Nm) torque.

5. Insert the pin (item #26) through the bracket (item #39)

and secure with the washers (item #76) and cotter pins
(item #78). Replace nuts (item #69) and tighten to 10 ft-
lbs. (13.5 Nm) torque.

6. Center the tensioner bar between the drum flanges.

Loosen (but do not remove) the mounting bolts (item
#51) and center with a scale or tape measure. Tighten
the mounting bolts to 87 ft-lbs (118 Nm) torque.

7. Reconnect the air supply to the “T” fitting (item #80) on

the cable tensioner. Do not tighten more than 1/4 turn
beyond hand tight. If the cable was removed, do not
energize the cable tensioner until the cable is
installed. See Cable Installation, page 4.

16

51

2

69

78

82

33

32

81

26

39

76

69

75

4

68

69

78

94

6

49

76

80

AIR SUPPLY

CONNECTS

HERE

Advertising