To switch on power to the system – Agilent Technologies 85225F User Manual

Page 87

Advertising
background image

Installing the System

2

Installation and User’s Guide

87

To switch on power to the system

N O T E

Proper system operation is dependent on the sequence in which the
system components are switched on.

To switch on power to the system

Step

Notes

1 Ensure that the individual instruments are

configured to match the available line power
source.

*

•

For information regarding line power
settings, refer to the individual instrument
manuals.

2 Ensure that all component line power

switches are set to the OFF position.

3 Connect the system to line power.

4 Switch the rack cabinet ~ Line switch from

to

(from standby to energized).

5 Switch on the low leakage switch mainframe

line power.

6 Switch on the precision LCR meter line

power.

7 If present, on the 4284A SYSTEM CONFIG

page, highlight the value in the GPIB
ADDRESS field, and press 24 > Enter.

•

This sets the correct system GPIB address
(24) for the 4284A.

8 If present, on the 35670A front panel, press

Local/GPIB > ANALYZER ADDRESS > 22 >
ENTER.

•

This sets the correct system GPIB address
(22) for the 35670A.

9 If present, switch on the Agilent 4156C

precision semiconductor parameter analyzer
line power.

10 If present, switch on the 41501B expander

line power.

•

The expander must be switched on before
the 4156C.

11 Switch on the Agilent 4156C precision

semiconductor parameter analyzer line
power.

•

Ensure that the 41501B has already been
switched on prior to activating the 4156C.

12 On the 4156C, press System >

[MISCELLANEOUS], move the pointer to the
POWER LINE FREQUENCY field, and press
[50 Hz] or [60 Hz].

•

This ensures that the 4156C is configured to
match the available line power frequency.

•

The value is set to 60 Hz at the factory.

•

Use the front panel arrow keys to move the
cursor.

Advertising