B3.2 mounting of din rails, B3.2, B3-2 – Yokogawa YFGW610 User Manual
Page 25
Advertising

<B3. Mounting>
B3-2
IM 01W02D02-01EN
B3.2 Mounting of DIN Rails
First, install the DIN rails on the general-purpose instrumentation board or the cabinet wall. Se-
cure the DIN rails by tightening the appropriate number of screws. Be careful that the rails do not
get bent or deformed due to the weight of YFGW610 or cable tension.
To securely ground YFGW610, insert an insulation bushing between the DIN rails and mounting
panel and tighten the screws. Insulate the DIN rails from the metal surface of the mounting panel.
Insulated bushing
DIN rail
Insulated bushing
Advertising
See also other documents in the category Yokogawa Sensors:
- EJA120A (31 pages)
- EJA130A (47 pages)
- EJA120A (40 pages)
- EJA438 (5 pages)
- EJA120A (6 pages)
- EJA115 (85 pages)
- EJA120A (47 pages)
- EJA120A (79 pages)
- EJA130A (2 pages)
- EJA130A (4 pages)
- EJA210A (70 pages)
- EJA130A (4 pages)
- EJA430A (78 pages)
- EJA210E (9 pages)
- EJX115A (55 pages)
- EJA210E (41 pages)
- EJA210E (96 pages)
- EJA210E (52 pages)
- EJA210E (89 pages)
- EJA210E (170 pages)
- EJX120A (4 pages)
- EJX910A (55 pages)
- EJX910A (175 pages)
- EJX910A (83 pages)
- EJX910A (9 pages)
- EJX910A (103 pages)
- FlowNavigator Software (163 pages)
- EJA530A (67 pages)
- EJA120A (83 pages)
- EJX530A (52 pages)
- EJA110E (4 pages)
- EJA110E (85 pages)
- EJX120A (85 pages)
- EJA118 (76 pages)
- EJX118A (64 pages)
- EJA438 (72 pages)
- EJA430E (85 pages)
- EJA430E (7 pages)
- EJX430A (6 pages)
- EJX430A (40 pages)
- EJX430A (76 pages)
- EJA430E (41 pages)
- EJA430E (96 pages)
- EJX438A (10 pages)
- ADMAG AXR (194 pages)