3 operation procedure, Operation procedure -4, Verification operation – Yokogawa FieldMate User Manual
Page 12

<2 OUTILINE>
2-4
IM 01R01A11-01EN
2.3
Operation Procedure
Figure 2.3.1 summarizes operation procedure.
To complete “Standard VF”, start-up Verification Tool from “Segment Viewer”. See 4.1.
4 START-UP
1 to 3 PREPARATION
4.1 Segment Viewer
4.2 Device Navigator
4.3 Verification Data
in “Device Maintenance Info”
4.4 History
5 LAUNCHING
Use the existing data?
5.3 General Information
No. New data
Yes
6.1 Main Screen
8 TERMINATION
6.3 Enhanced VF
(Optional)
5.2 Load
6.2 Standard VF
(Mandatory)
Save the verification data ?
No
Yes
6.1.2 Save
6.1.3 Print out
6.4 Result
Verification
Operation
Verification Tool and AXF:
Offline
Verification Tool and AXF:
Online
Verification Tool and AXF
Online
Offline
Online
Offline
IMP
OS
SIB
LE
IMP
OS
SIB
LE
FieldMate and AXF
F020301.ai
Figure 2.3.1 Operation Procedure