Checking after replacing heater unit, 1 checking wiring, 2 checking heater operation – Yokogawa Integral Oxygen Analyzer ZR202 User Manual

Page 18: Checking after replacing heater unit -1, Checking wiring -1, Checking heater operation -1

Advertising
background image

<3. Checking After Replacing Heater Unit>

3-1

IM 11M12A01-21E

3. Checking After Replacing Heater Unit

3.1 Checking Wiring

Model ZR22A (Separate type heater) uses screw termination.

CELL +

TC +

TC –

TC

CELL

CJ

1

2 3

4 5

6

8

7

HTR

F3.1E.ai

HEATER

Figure 3.1 Model ZR22A Terminal wiring diagram

Model ZR202A (Integrated type heater) uses a connector.

Zero

Span

F3.2E.ai

Connector

for heater

Signal connector

Solenoid valve connector when

ZR20H automatic calibration unit used.

Figure 3.2 Bottom view of Model ZR202A Connector wiring diagram

3.2 Checking Heater Operation

After turning on the power, check that heater heats up normally.
For separate type (ZR22A) see IM11M12A01-02E, 03E section 7.3, and for integrated type (ZR202A)

see IM11M12A01-04E, 05E section 7.3 “Supplying Power to Converter Unit”.
After confirming that operation is satisfactory, return detector to operation. Calibrate before taking

measurements.

Advertising
This manual is related to the following products: