Wiring procedure, Input terminal arrangement – Yokogawa Button Operated MV2000 User Manual

Page 23

Advertising
background image

Connecting the input wires in parallel with other devices can cause signal
degradation, affecting all connected devices. If you have to make a parallel
connection, then
• Turn the burnout detection function OFF.
• Ground the instruments to the same point.
• Do not turn other instruments ON or OFF during operation. This can have adverse

effects on the other instruments.

• Do not connect RTDs in parallel.

Wiring Procedure

There is a terminal cover screwed onto the signal input terminal block on the rear panel.
It has a label indicating the terminal arrangement on it.

1.

Turn the MV OFF and remove the terminal cover.

2.

Connect the signal wires to the terminals.

R

ecommended torque for

tightening the screws

Screw terminals

0.9 to 1.0 N•m

Clampted terminals 0.22 to 0.25 N•m

3.

Replace the terminal cover and fasten it with screws. The appropriate tightening

torque for the screws is 0.6 N

m.

Note

It may be difficult to firmly secure input signal wires with diameters of 0.3 mm or less to clamp
terminals. To secure the wires, try folding the conductive parts over when you connect them to
the clamp terminal.

Input Terminal Arrangement

Input terminal block 2

Input terminal block 1

Input terminal

block

Channel allocation by model

MV1004

MV1006

MV1008

MV1012

MV1024

1

1 to 4

1 to 12

2

1 to 4

1 to 6

5 to 8

1 to 12

13 to 24

Connecting Input Cables

23

IM MV1000-02E

Advertising
This manual is related to the following products: