Step 5 final assembly, Step 6 initial testing of drain basin system, Figure 5.1 – Star Water Systems S1104 User Manual

Page 6

Advertising
background image

6

© Copyright 2004. All rights reserved.

STEP

5

Final Assembly

NOTE: External plumbing confi guration will vary depending on the location of basin, location of main stack

and available space.

5.1) Place the pump in the basin as shown in Figure 5.1.

NOTE: If installing the internal trap, rotate the tail pipe to the orientation shown in Figure 5.1.

5.2) Install the lid components as shown in Figure 5.2.

NOTE: Pull excess cordage through the opening and install the cordseal as shown in Figure 5.3A.

Ensure o-ring is in the cap before installation.

5.3) Place the basin assembly in its fi nal position and complete plumbing. Secure all connections

(shown in 5.3A or 5.3B).

Figure 5.1

Figure 5.2

Figure 5.3A

Figure 5.3B

SK2005

SK2007A

SK2006

SK2006

SK2007B

*

*

CHECK VALVE MUST BE

PURCHASED SEPARATELY

*

STEP

6

Initial Testing of Drain Basin System

6.1) Plug the cord into a properly grounded GFCI receptacle.
6.2) Fill tank with water.
6.3) Check all plumbing for leaks as the basin fi lls.
6.4) Verify that the pump starts and stops.
6.5.) Check the discharge line for leaks as the pump empties the basin.
6.6.) Repeat steps 6.2 to 6.5 as necessary to insure proper operation.
6.7.) If problems persist refer to the troubleshooting guide located at the back of the manual.

1/4 - 20 x 1"
S.S. SCREWS

1/4 - 20 STD.
S.S. FLAT WASHERS

DISCHARGE PIPE

1 1/2" SLP x NPT

2" SLP x NPT

CORD SEAL

1/4 - 20
S.S. NUTS

1/4 - 20 STD.
S.S. FLAT WASHERS

(TORQUE TO 30 IN-LB)

SEE NOTE

(APPLY SEALANT TO THREADS)

CAP

O-RING

O-RING

CAP

CAP SECTION VIEW

KEY

TRAP INLET

GFCI

OUTLET

GFCI

OUTLET

CORD SEAL

CAP

UNION

(PURCHASED SEPARATELY)

CHECK VALVE

DISCHARGE PIPE

DISCHARGE PIPE

CHECK VALVE

CAP

UNION

(PURCHASED SEPARATELY)

CORD SEAL

INLET

INLET

INTERNAL TRAP INSTALLATION

STANDARD INSTALLATION

Advertising