Van Air Systems D12-D36 User Manual

Page 7

Advertising
background image

PAGE 7

WARNING

DO NOT REMOVE, REPAIR, OR REPLACE ANY ITEM ON

THE DRYER WHILE IT IS UNDER PRESSURE.

DEPRESSURIZE THE DRYER COMPLETELY BEFORE

STARTING INSTALLATION AND/OR MAINTENANCE

PROCEDURES. SERIOUS PERSONAL INJURY MAY

RESULT IF THESE SAFETY RULES ARE NOT FOLLOWED.

DO NOT REMOVE THE HATCH COVER UNTIL ALL AIR

PRESSURE IS OUT OF THE VESSEL. PUSH ON THE

HATCH COVER BY HAND TO FIND OUT IF THE VESSEL

PRESSURE IS REDUCED TO ZERO.

DO NOT TRY TO TIGHTEN THE HATCH COVER IF YOU

HEAR OR FEEL A LEAK. IMMEDIATELY SHUT OFF THE

AIR OR GAS SUPPLY TO THE VESSEL AND REDUCE

THE DRYER PRESSURE TO ZERO.

ALWAYS INSTALL A NEW GASKET EVERY TIME THE

HATCH COVER IS REMOVED, OR AT LEAST ONCE PER

YEAR. REPLACE THE HATCH COVER EVERY FIVE

YEARS REGARDLESS OF CONDITION. USE VAN AIR

AUTHORIZED PARTS ONLY.

DO NOT USE POWER TOOLS OR CHEATER BARS TO

TIGHTEN THE NUT ON THE COVER. TOO MUCH FORCE

CAN DISTORT THE COVER AND/OR THE GASKET. IF

DAMAGED BY OVERTIGHTENING, THE COVER CAN

BLOW OUT AND CAUSE SERIOUS INJURY. (Note:

Tighten the nutonly until it is snug . When pressure is in

the vessel, the seal will be complete.)

INSPECT THE COVER AND SEALING SURFACE EVERY

TIME THE COVER IS REMOVED, OR AT LEAST ONCE

PER YEAR, FOR DAMAGE SUCH AS CORROSION,

CRACKS, OR DISTORTION. IF THERE IS ANY DAMAGE,

INSTALL A NEW COVER AND GASKET. USE VAN AIR

AUTHORIZED PARTS ONLY.

4.4 ADDITION OF DESICCANT

Open the bypass valve. Close the dryer inlet and outlet isolation

valves. If the bypass and inlet and outlet isolation valves were not

installed, shut down the air system.

Open the drain valve and allow the dryer to depressurize completely.

Loosen the nut on the hatch cover.

Push on the hatch cover. If the vessel is depressurized, the cover will

unseal. Once the seal is broken, tilt the hatch cover and remove it

from the dryer.

Add the amount of desiccant tablets required to raise the supply to

the maximum operating level or to maximum level (see FIGURE 5);

then level off the tablet bed.

CAUTION

Make sure that the desiccant does not cover the screen

on the outlet pipe.

Do NOT overfill the vessel. Adequate space must be left

to allow the hatch cover to be installed.

Check the condition of the hatch cover. If it is damaged, it must be

replaced. The gasket should be replaced every time the hatch cover

is removed or at least once a year.

Check the sealing surface of the opening. If it is contaminated with

dirt or rust, it must be cleaned before installing the hatch cover. A

contaminated surface may prevent the gasket from properly sealing.

Install the filler hatch cover and gasket. Finger tighten the nut on the

hatch cover. Overtightening will cause damage to the nut. The cover

will seal when the vessel is pressurized.

Start up the dryer following the procedures in Section 3.1.

To use the chart, first determine the SCFM that is being

processed through the dryer. Locate the nearest flow rate listed

on the chart and interpolate as necessary.

The consumption rate is proportional to the moisture loading.

Each 20

o

F increase in inlet temperature changes the moisture

loading by a factor of nearly 2:1.

The quantity shown in the consumption rate chart is NOT the

quantity that must be added to the dryer at one time. The bed

level should be maintained at least to the minimum level at all

times to ensure optimum drying capabilities. The consumption

rate is an approximation of how much desiccant will be

added over a period of one year.

4.4-B DESICCANT USAGE GUIDE

The chemical and physical characteristics of Van Air desiccant

contribute to its effectiveness and economy.

The DESICCANT CONSUMPTION RATE should be used as a

guide to estimate the usage of desiccant your installation will require.

The formula is based on an annual usage rate of one shift per day,

5 days per week and 50 weeks per year or 2,000 operating hours per

year. The figure is an average and may vary depending upon your

actual conditions (i.e. 24 hour operation, higher inlet temperature,

excessive liquid water content and/or contaminants.)

DESICCANT CONSUMPTION

(Based on 1 shift for a one year period @ 100 psig inlet pressure and

75

o

F inlet temperature, 100% RH.)

FLOW

SCFM

20
50

100
200
300
500
700

1000

DRY-O-LITE

LBS/YEAR

26.4
66.0

132.0
264.0
396.0
660.0
924.0

1320.0

SP

LBS/YEAR

133

332.5
665.0

1330.0
1995.0
3325.0
4655.0
6650.0

10 BF

LBS/YEAR

115.2
288.0
576.0

1152.0
1728.0
2880.0
4032.0
5760.0

4.4-A BED LEVEL GUIDE

To determine the supply of desiccant in the dryer, insert a

measuring stick through the filler hatch until it reaches the top of

the desiccant bed; dimensions in FIGURE 5 are calculated from

the filler hatch to levels indicated on the drawing. (NOTE:

Dimensions are approximate and are intended as a general guide

only.)

SECTION 4

MAINTENANCE

Advertising