In-Situ Rugged TROLL 100/200 Operators Manual User Manual
Page 16
Advertising
![background image](/manuals/367692/16/background.png)
800-446-7488
16
www.in-situ.com
1. Create a loop on the uphole end of the cable and loosely bind it with one zip tie.
2. Place the metal loop inside the cable loop. Push the zip tie up to form a tight band
around the metal loop. Tighten the zip tie.
3. Place the second zip tie directly below the first and tighten.
4. Place the third zip tie about 2.5 cm (1 in.) below the first two ties. Place the fourth zip
tie snugly against the third.
5. Hand tighten the zip ties. Do not over tighten.
6. Clip the excess tie material from the unit.
7. Deploy from a well dock or other secure location.
Advertising
This manual is related to the following products: