Operational startup, Part number information, Operational startup 10 – Badger Meter 1200 User Manual

Page 10: Part number information 10

Advertising
background image

OPERATIONAL STARTUP

Follow these steps when installing and starting the meter

MAKE SURE TO SHUT OFF FLUID FLOW AND RELEASE THE PRESSURE IN THE LINE BEFORE ATTEMPTING TO INSTALL THE

METER IN AN EXISTING SYSTEM.
1 After meter installation, close the isolation valves and open the bypass valve Allow liquid to flow through the bypass valve

for sufficient time to eliminate any air or gas in the flow line

STRIKING AN EMPTY METER WITH HIGH VELOCITY FLOW STREAM CAN CAUSES DAMAGE.
2 Open upstream isolating valve slowly to eliminate hydraulic shock while charging the meter with the liquid Open the

valve to full open

3 Open downstream isolating valve to permit meter to operate
4 Close the bypass valve to a full closed position
5 Adjust the downstream valve to provide the required flow rate through the meter

OTEE:

N

The downstream valve may be used as a control valve

PART NUMBER INFORMATION

Part Number

End Connection

Flow Ranges

Approximate K factor

Pulses/Gal

gpm

lpm

B121-225

1/2 in Male NPT

0 25…2 5

0 57…9 46

29,000…33,000

B121-250

1/2 in Female NPT

0 75…7 5

0 95…28 39

8500…9500

B121-275

1 in Male NPT

2 5…25

1 89…94 64

2800…3000

Turbine Flow Meter, Model 1200 Turbine Flow Meter

Page 10

November 2013

Advertising