Scope of the manual, Specifications, Product unpacking and inspection – Badger Meter Water Conditioning User Manual

Page 5: Installation, Preliminary considerations, Scope of the manual 5, Specifications 5, Product unpacking and inspection 5, Installation 5, Preliminary considerations 5

Advertising
background image

SCOPE OF THE MANUAL

This manual contains information concerning the installation, operation and maintenance of Badger Meter magnetic drive

turbo meters To ensure efficient operation of the meters, the instructions given in this manual should be thoroughly read and

understood Retain the manual in a location where it is readily available for reference

SPECIFICATIONS

Maximum Operating Temperature

250 5° F (120 5° C)

Maximum Operating Pressure

150 psi (10 bar)

Optional: 300 psi (bronze), 250 psi (cast iron)

Accuracy Over Entire Range*

± 1 5%

Repeatability

0 5 or better

Connections

Round flange ASA or DIN

Body Materials

SS 316, bronze, cast iron

Rotor and Nose Cone Materials

Ryton

Head Assembly Materials

SS 316 or bronze

Straightening Vane Material

SS 316

Head Gasket Materials

Asbestos, Nitrile or Chloroprene

O-Ring Materials

EPR, Buna, Viton A

Bearing and Magnet Material

Ceramic

Spindle

SS 316

PRODUCT UNPACKING AND INSPECTION

Upon opening the shipping container, visually inspect the product and applicable accessories for any physical damage such

as scratches, loose or broken parts, or any other sign of damage that may have occurred during shipment

NOTE:

N

If damage is found, request an inspection by the carrier’s agent within 48 hours of delivery and file a claim with the

carrier A claim for equipment damage in transit is the sole responsibility of the purchaser

INSTALLATION

The procedures for installing Badger turbo meters are essentially the same for all meter sizes Any special instructions required

for the installation and/or electrical connection of meter-mounted or free-standing accessory devices such as registers, pulse

transmitters, valves and remote batch controllers will be provided as a supplement to this manual

Preliminary Considerations

• The Badger Meter 2" through 6" industrial turbo meters are designed for operation in HORIZONTAL piping arrangements
• If solid material is present in the liquid to be metered, a strainer may be required in the facility piping upstream of the

meter The 2", 3" and 4" meters require a strainer with 1/16" diameter holes and the 6" meter requires a strainer with 1/8"

diameter holes

• To permit periodic cleanout of the meter and to provide a convenient means of stopping fluid flow during maintenance, it

is recommended that a flushing system be incorporated into the facility piping arrangement

User Manual

Page 5

November 2013

Advertising
This manual is related to the following products: