Sterlco SDD Series User Manual

Page 64

Advertising
background image

882.01749.00

64

of

93

LED Yellow (Station)

on: Station Filled

off: Station Emptied

LED Green (Level Probe)

on: Power Supply Available

off: Power Supply Not Available

Trim-pot with

Plastic Screw M3

Cable

Blind Lid

Protective Screw

npn: Normally Closed

pnp: Normally Open

1

0

npn: Normally Open

pnp: Normally Closed

Level Probe

Figure 7. Level Sensor Adjustment Screw

4. Turn the trim-pot until the yellow control lamp just switches off.

NOTE: Turning the trim-pot to the left decreases the switching sensitivity, and

turning it to the right increases the sensitivity.

5. Fill the dosing station until the level probe is two-thirds covered. The yellow control

lamp should now switch on again. If not, repeat Step 4.

6. Reinstall the plastic screw (M3).

NOTE: The sliding switch under the cover must be set on “0”.

Advertising