Chapter 4: maintenance – Sterlco SDD Series User Manual

Page 68

Advertising
background image

882.01749.00

68

of

93

Chapter 4: Maintenance

4-1 Preventative Maintenance Intervals

Daily:

Check warning signs on equipment for good legibility and

completeness.

Weekly:

Check function of the “On/Off” Switch.

Check shear plate and mounting hardware in “DD” dosing

station.

Every 3
months:

Check wiper and mounting hardware in “DT” dosing station.

Every 6
months:

Check that all electrical and mechanical connections are

tight.

Check adjustment of the level probes (optional).

Annually:

Check dosing disc in dosing station DD and DT.

Each time
after material
Is changed:

Clean the dosing station.

Check shear plate or wiper.

Check dosing disc.

CAUTION:

Always disconnect power and remove the dosing

module from the motor assembly before taking the

dosing module apart.

Injury could result if fingers are pinched between


the rotating disc.

Advertising