Sterlco SDD Series User Manual

Page 78

Advertising
background image

78 of 96

4-5 Removing the “DT” Disc and cleaning the dosing station

1. Switch the control unit “Off” with the

“On/Off” switch.


2. Disconnect the power supply.

3. Open the toggle latches.

4. Remove the dosing hopper (D) from the

motor.


5. Empty the dosing station.

6. Open the profile clamp (C).

7. Remove the profile clamp (C).

8. Remove the dosing hopper assembly

(A and B).


9. Remove the two M6 x 30 socket screws (B)

on top of the dosing disc (A).
Lift the dosing disc (A) from the
dosing unit housing.


10. Clean the components with a cotton cloth.

11. Clean the dosing hopper (A and B) in soapy

water.


12. Dry all parts thoroughly.

13. Install the dosing hopper on the dosing

module (locating the guide pin).


14. Install the profile clamp and tighten

the screw.


15. Mount the dosing housing onto the dosing motor.

16. Close the toggle latches, securing the dosing module to the motor assembly.

Advertising