150kW InfraStruXure System—Installation and Start-Up

Space Considerations

Study the figure below to determine your space requirements for installing the InfraStruXure PDU.
Consult your local codes and NEC for additional requirements.

Ceiling Clearance
>12in (304mm)

Minimum Rear Clearance

42in (1067mm)

Minimum Front Clearance

42in (1067mm)