150kW InfraStruXure System—Installation and Start-Up
9
Electrical Requirements and Specifications
Procedures requiring a licensed electrician
Electrical requirements
† Provided by customer.
‡The specifications are recommendations. Consult the NEC and local code for requirements specific to your
installation.
Electrical
Hazard
Only a certified electrician can:
• Connect the PDU to its power source
• Connect a switch to the EPO interface on the PDU
• Install a customer-specified, hard-wired power cable
• Perform maintenance of the PDU
480V
600V
Service distribution breaker
†‡
225A
200A
Conductors to Main Input switch
†
3W + G + GEC
3W + G + GEC
Recommended wire sizing
‡
L1, L2, L3
2/0AWG
2/0AWG
G
6AWG
6AWG
GEC
4AWG 4AWG