Start-Up Procedure

150kW InfraStruXure System—Installation and Start-Up

35

Apply power to the system

1. Set the upstream input circuit breaker (utility or UPS) to ON.

2. Set the Main Input on the PDU to ON.

3. Verify that the proper voltage is present on the secondary winding of the transformer (208V,

metered phase-to-phase), using a true RMS voltmeter.