ADTRAN 1200214L1 User Manual

Page 72

Advertising
background image

48

IQ Probe User Manual

61200214L1-1

Chapter 6. DTE Port Configuration

Follows Network (FOLLOW NET)

If ENABLED, PVC signaling responses are sent to the router
only when the network signaling state is up. Enable this option
when the router is going to use an alternate path for dial backup.

Advertising
This manual is related to the following products: