HP 1.10GB Virtual Connect Ethernet Module for c-Class BladeSystem User Manual
Page 138
Advertising
Server management 138
g.
On the Server Profiles screen, be sure that the server profile with FCoE connections has been
properly assigned.
4.
Power up the HP ProLiant BL680c G7 Server Blade.
a.
Click the device bay for the HP ProLiant BL680c G7 Server Blade in the Hardware Overview section
in the left navigation panel. The Server Bay Status screen appears.
b.
Click Momentary Press to power up the server blade.
c.
Be sure that the Power Status/Control indicator turns green and the status value is is On.
5.
Verify the HP ProLiant BL680c G7 Server Blade FCoE connections.
Advertising
This manual is related to the following products: