Schedule create virtual copy – HP 3PAR Operating System Software User Manual

Page 352

Advertising
background image

If day 31 is selected, the checkboxes for February, April, June, September, and
November are disabled.

If day 29, 30, or 31 is selected, the checkbox for February is disabled.

Days of Week – (Disabled if the Days of Month checkbox is selected.) When the Days
of Week checkbox is selected, the Days of Week panel is expanded. By default, all days
are selected. Deselecting the All checkbox clears the selections. Deselecting any day
when the All checkbox is selected also deselects the All checkbox.

Schedule Create Virtual Copy

The Schedule Create Virtual Copy is an extension of the Create Virtual Copy wizard, with the
additional Schedule box at the bottom. When you open the Schedule Create Virtual Copy dialog,
the Create Schedule radio button is preselected.

When creating a schedule, the next available snapshot ID will always be used. Therefore, the Auto
checkbox for the id and the id field itself are hidden when the Show advanced options checkbox
is deselected and disabled when both a Parent Volume and the Show advanced options checkbox
are selected.

Read Only and Read/Write radio buttons are also hidden, as the procedure creates the intermediate
volume if making a RO from RO or RW from RW. The radio buttons will be selected accordingly
depending on the Parent Volume. Read Only will be selected if the parent is RW and Read/Write
will be selected if the parent is RO.

To schedule a Create Virtual Copy task:
1.

Selection Tasks & Schedules in the Manager Pane.

2.

In the Common Actions Panel, select Schedule Create Virtual Copy.

The Create Virtual Copy wizard appears.

3.

The Create Schedule radio button will be preselected.

4.

System – Select the system on which the virtual copy will be created.

5.

(Optional) Domain – Select the domain in which the virtual copy will reside.

6.

Parent Volume – Select the virtual copy's parent volume.

7.

Destination Volume – Enter the destination volume's name.

NOTE:

If you selected a virtual volume set from the Parent Volume list, the Destination

Volume field is automatically populated with @[email protected], meaning that @vvname@ is
replaced with the names of the virtual volumes belonging to the selected virtual volume set.
For example, if your virtual volume set contains virtual volumes named VV1, VV2, and VV3,
the destination virtual volumes will be named VV1.copy, VV2.copy, and VV3.copy. If you

wish to edit the way the destination volumes are named, click the Edit button (

) to the

right of the Destination Volume field to access the Edit Volume Set Name dialog box. (For
more information, see

“Edit Volume Set Name Dialog” (page 353)

.)

8.

Comments – Enter any notes.

9.

If you wish to set a retention time, select Show advanced options, click the Retention Time
checkbox, enter a value in the corresponding field, and select a unit of measure, day(s) or
hour(s).

10. If you wish to set an expiration time, select Show advanced options, click the Expiration Time

checkbox, enter a value in the corresponding field, and select a unit of measure, day(s) or
hour(s).

11. Name – Enter the name of the schedule.
12. If you wish to be alerted if a task fails, check the Generate alert if task fails checkbox.
13. Follow the directions under

“The Common Schedule Panel” (page 349)

to set the recurrence

schedule.

352 Tracking and Scheduling Tasks

Advertising
This manual is related to the following products: