Smart array enablement mini-sas cable option – HP ProLiant SL250s Gen8 Server User Manual

Page 55

Advertising
background image

Hardware options installation 55

14.

Install the FBWC capacitor pack into the holder mounted in the server tray.

15.

Install the front GPU bracket (on page

20

).

16.

Install the interposer board (on page

19

).

17.

Install the front GPU cage (on page

17

).

18.

Install the SFF hot-plug drive cage ("

Installing the SFF hot-plug drive cage

" on page

23

).

19.

Install the server into the chassis ("

Installing the server into the chassis

" on page

31

).

20.

Connect all peripheral cables to the server.

21.

Power up the server (on page

15

).

Smart Array enablement Mini-SAS cable option

1.

Power down the server (on page

15

).

2.

Disconnect all peripheral cables from the server.

3.

Remove the server from the chassis (on page

15

).

4.

Remove the SFF hot-plug drive cage ("

Removing the SFF hot-plug drive cage

" on page

22

).

5.

Remove the front GPU cage (on page

16

).

6.

Remove the interposer board (on page

18

).

7.

Remove the front GPU bracket (on page

19

).

8.

Remove the PCI riser cage (on page

23

).

9.

Install the storage controller ("

Installing an expansion board

" on page

57

).

Advertising