Expansion board options, Installing an expansion board, Installing an expansion – HP ProLiant SL250s Gen8 Server User Manual

Page 57: Board

Advertising
background image

Hardware options installation 57

17.

Route the Mini-SAS cable from the storage controller and connect it to the SFF hot-plug drive cage

backplane. For more information see Mini-SAS cabling (on page

79

).

18.

Install the server into the chassis ("

Installing the server into the chassis

" on page

31

).

19.

Connect all peripheral cables to the server.

20.

Power up the server (on page

15

).

Expansion board options

Installing an expansion board

1.

Power down the server (on page

15

).

2.

Remove the server from the chassis (on page

15

).

3.

Remove the SFF hot-plug drive cage ("

Removing the SFF hot-plug drive cage

" on page

22

).

4.

Remove the front GPU cage (on page

16

).

5.

Remove the interposer board (on page

18

).

6.

Remove the front GPU bracket (on page

19

).

7.

Remove the expansion slot cover from the PCI riser cage.

8.

Remove the PCI riser cage (on page

23

).

Advertising