HP ProLiant SL250s Gen8 Server User Manual
Page 58

Hardware options installation 58
9.
Install the expansion board into the slot until it seats firmly.
10.
Install the PCI riser cage (on page
IMPORTANT:
The server does not power up if the PCI riser cage is not seated properly.
11.
Connect any required internal cables to the expansion board. Refer to the documentation that ships with
the expansion board.
12.
Install the front GPU bracket (on page
13.
Install the interposer board (on page
14.
Install the front GPU cage (on page
15.
Install the SFF hot-plug drive cage ("
Installing the SFF hot-plug drive cage
" on page
16.
Install the server into the chassis ("
Installing the server into the chassis
" on page
17.
Connect any required external cables to the expansion board. Refer to the documentation that ships
with the expansion board.
18.