Leveling requirements, Condensation management – HP Modular Cooling System User Manual

Page 60

Advertising
background image

Water quality and leveling requirements, and condensation management 60

Leveling requirements

Adjust the MCS leveling feet so that the unit is level.
For more information about seismic area considerations, refer to the HP Modular Cooling System Site

Preparation Guide on the HP website
(

http://h20000.www2.hp.com/bizsupport/TechSupport/DocumentIndex.jsp?contentType=SupportManu

al&lang=en&cc=us&docIndexId=64179&taskId=101&prodTypeId=3447589&prodSeriesId=3657806

).

Condensation management

Any condensation that forms is collected in each individual cooling module and to a condensation tray
integrated in the base assembly.
As an option, when the specified condensation level in the condensation tray is reached, a sensor activates

a pump that pumps the condensation into the return system. A further discharge tube runs out of the system
from condensation tray to drain excess fluid if needed. This hose should be connected to a collection system
or an external drain. If the optional pump is not installed, condensation is removed through a regular drain

tube. This drain tube must be connected downward to a collection system.
To ensure reliable drainage:

Ensure no kinks form in the drainage hose.

Do not reduce diameter of drainage hose.

Route the drainage hoses so that they always run downhill.

To avoid excessive buildup of condensate and to conserve energy, consider raising the cooling water

temperature to the necessary cooling capacity.

Advertising