HP ProLiant DL580 G3 Server User Manual

Page 87

Advertising
background image

Expansion board options

87

2.

Extend or remove the server from the rack ("Extending the server from the

rack" on page

38

).

3.

Remove the access panel ("Removing the access panel" on page

40

).

4.

Remove the expansion boards from slots 3 and 4, if installed, to gain access

to the mezzanine connectors.

5.

Remove the expansion slot covers from slots 1 and 2.

6.

Use the guide pins to align the mezzanine board, and seat the mezzanine

board onto the system board.

7.

Tighten the three thumbscrews to secure the mezzanine board.

Advertising