HP ProLiant DL580 G3 Server User Manual
Page 87
Advertising
Expansion board options
87
2.
Extend or remove the server from the rack ("Extending the server from the
3.
Remove the access panel ("Removing the access panel" on page
4.
Remove the expansion boards from slots 3 and 4, if installed, to gain access
to the mezzanine connectors.
5.
Remove the expansion slot covers from slots 1 and 2.
6.
Use the guide pins to align the mezzanine board, and seat the mezzanine
board onto the system board.
7.
Tighten the three thumbscrews to secure the mezzanine board.
Advertising