Ashland 1200 TR User Manual

Page 31

Advertising
background image

31

OPERATING CONDITION.

17. IN PIPING THE HYDRAULIC SYSTEM ON THE EQUIPMENT, USE ONLY MATERIALS OF

ADEQUATE SIZE AND STRENGTH TO SUIT THE FLOWS AND PRESSURES WHICH WILL BE

PRESENT IN THE SYSTEM. IF A SCHEMATIC IS PROVIDED, IT PROBABLY SHOWS MINIMUM

SUGGESTED LINE SIZES. LENGTH OF RUNS AND PRACTICAL EXPERIENCE MAY INDICATE USE

OF LINE SIZES LARGER THAN SHOWN ON THE SCHEMATIC. USE SAFETY FACTORS IN SELECT-

ING MATERIALS FOR STRENGTH TO AllOW FOR SHOCK AND OVER-PRESSURE CONDITIONS

WHICH MAY OCCUR.

Advertising