JELD-WEN JII023 Vinyl Projecting Windows with Integral Nailing Fin User Manual

Page 2

Advertising
background image

INSTALLATION INSTRUCTIONS

for Vinyl Projecting Windows with Integral Nailing Fin (JII023)

2

1

REMOVE PACKAGING AND INSPECT WINDOW

MATERIALS

Note!

Follow all material manufacturers’ instructions for proper use

and compatibility.
• 1 3/4" galvanized roofing nails. Nails must penetrate at least 1" into

framing (or as required by local code).

• #10 x 3 1/2" corrosion resistant pan head screws. Screws must

penetrate at least 1" into framing (or as required by local code).

• Non water-degradable or compressible shims to level the sill
• 4", 6", or 9" (as required by local code and window configuration)

wide self-adhesive flashing: We recommend OSI

®

QUAD

®

Butyl

Flashing Tape or equivalent.

• Spray adhesive/primer for self adhesive flashing. Such as Loctite

®

300

or equivalent

• Sealant: We recommend OSI

®

QUAD

®

Max Sealant or equivalent. This

can be used in any application and can be painted or ordered in a
color matched product, if desired.

REMOVE PACKAGING

Remove shipping materials such as corner covers, shipping blocks or
pads. If there is a protective film on the glass, do not remove it until
installation and construction are complete.

INSPECT YOUR WINDOW

• Cosmetic damage
• Product squareness (diagonal measurements not more than 1/8"

different)

• Correct product (size, color, grid pattern, handing, glazing, energy-

efficiency requirements, etc.)

• Cracked frame welds

NEEDED MATERIALS AND TOOLS

• Backer rod 1/8" larger than the widest portion of the gap (used in

conjunction with sealant bead).

• Polyurethane low expansion Window and Door foam: We recommend

OSI

®

QUAD

®

Foam or equivalent).

• Non water-degradable or compressible shims

TOOLS

• Tape measure
• Utility knife
• Level (4' minimum

recommended)

• J-roller

• Caulking gun
• Drill with 1/8" tapered bit and

3/8" countersink

• Construction stapler with 3/8"

staples

• Hammer

SAFETY

• Read and fully understand ALL manufacturers’ instructions before

beginning.

• Do not work alone. Two or more people are required. Use safe lifting

techniques.

• Use caution when handling glass. Broken or cracked glass can cause

serious injury.

• Wear protective gear (e.g. safety glasses, gloves, ear protection, etc.).
• Operate hand/power tools safely and follow manufacturer’s operating

instructions.

• Use caution when working at elevated heights.

SAFETY AND HANDLING

WINDOW AND MATERIALS HANDLING

• Make sure operable windows are closed and locked prior to

installation.

• Heed material manufacturers’ handling and application instructions.
• Protect adhesive surfaces from dirt, moisture, direct sunlight and

folding over onto themselves.

• Handle in vertical position; do not carry flat or drag on floor.
• Do not put stress on joints, corners, or frames.
• Store window in dry, well-ventilated area in vertical, leaning position

to allow air circulation; do not stack horizontally.

• Protect from exposure to direct sunlight during storage.
• Install only when conditions and sheathing are dry.

IF INJURY OCCURS, IMMEDIATELY SEEK MEDICAL ATTENTION!

• Splits, cracks, holes, missing sections or other damage to the nailing

fin longer than 6" and/or within 1/2" of window frame

• For units with integral head and seat boards, ensure the top of the

mull joints are covered and sealed with silicone.

If any of the above conditions represent a concern, or if you expect
environmental conditions to exceed the window’s performance rating,
do not install the window. Contact your dealer or distributor for
recommendations.

Advertising