INSTALLATION INSTRUCTIONS

for Vinyl Projecting Windows with Integral Nailing Fin (JII023)

5

APPLY THE SELF-ADHESIVE FLASHING

Note!

Keep the edge of the self-adhesive flashing as close to the

window frame as possible.
3. Fold the head

board piece

lengthwise into

“L” shape. Center

and apply one

leg to head

board and the

other to the wall

above the rough

opening header.

Cut the corners to

allow the flashing

to lay flat against

the wall.

4. Starting 2" above

the header, apply

the side pieces.

5. Center and apply

the header piece

above the header.

6. Press the flashing

down with a

J-roller.

7. Inspect self-

adhesive flashing

for gaps or

bubbles (remove

and replace if

necessary).

PREPARE FLASHING

1. Cut four pieces of self-adhesive flashing as follows:

• One head board piece 6" longer than the head board
• One header piece 12" longer than the header
• Two side pieces 7" longer than each side

SPRAY ADHESIVE/PRIMER

Note!

Protect window from overspray.

2. Apply spray

adhesive/primer

as instructed

to nailing fin,

sheathing and

building wrap

at the sides and

head as shown.

FLASH BAY/BOW WINDOW

6

Sp

ra

y

Ad

he

siv

e

6"

Fold

down

Cut

3"

2"

6"

6"

2"

1. If the window has

a pre-installed

cable support

system, follow

the instructions

provided by the

manufacturer.

2. If the cable

support system

is not used,

build seat board

bracing to

support at least

750 lbs of total

weight (window

plus window

contents). Primary

support should be

provided under

the mull joints of

the unit.

3. Remove temporary support after full support is installed.
4. Release the building wrap from above the header (previously taped

up) and overlap the header flashing. Seal the ends with self-adhesive

flashing or building wrap tape.

5. Seal all four corners of the window with a 1/4" bead of sealant. Tool

into a fillet shape.

6. The head and seat boards should be protected and insulated with a

structure designed and built as required by local code.

7. Create a continuous

air seal on the

interior jambs and

head between the

rough opening and

the window frame

with low expansion

polyurethane foam

or backer rod and

sealant. On the sill,

run a continuous

bead of sealant

along the foam

wedge where it

meets the window

frame or seat board.

AFTER INSTALLATION

1. Adjust window for best operation.
2. Install exterior wall surface within 30 days of window installation.
3. Maintain gap of 3/8" between window frame and final exterior wall

surface (siding, stucco, etc.).

4. Protect recently installed units from damage from plaster, paint, etc.

by covering the unit with plastic.

Note:

End of bay/bow installation instructions.

COMPLETE BAY/BOW WINDOW INSTALLATION

7

Bracing Under

the Mull Joints

Seal corners

Continuous air seal

Continuous

shim

Flashing

Sill

Rough

opening