INSTALLATION INSTRUCTIONS

for Vinyl Patio Doors with Integral Nailing Fin (JII006)

3

• Verify the width and

height of the patio

door are each

1/2"-3/4" smaller

than the rough

opening width/

height. Mulled

units should be

3/4" smaller.

• Verify the rough

opening is square.

The (A) and (B)

measurements

should be the same.

Maximum allowable

deviation from

square is 1/4".

A

B

D

C

E

Verify Square, Level, and Plumb

• Verify the rough opening is level and plumb (C). The maximum

allowable deviation is 1/8".

• The rough opening sill must not be crowned or sagged (D), but rather

level or sloped (positive slope) to the exterior.

• The exterior face of the rough opening must be in a single plane (E)

with less than 1/8" twist from corner to corner.

• Minimum double studs should be used at all wood framed

rough openings.

• The header must be supported by trimmer studs.

FOR RETROFIT INSTALLATIONS

After removing the old patio door, remove sufficient cladding (siding,

stucco etc.) to expose enough intact building wrap to properly seal the

patio door to the opening. If damaged, apply new building wrap in

shiplap manner. Verify the rough opening framing is structurally sound.

Contact your local waste management entities for proper disposal or

recycling of products being removed.

REMOVE PACKAGING

Remove shipping materials such as corner covers, shipping blocks or pads.

INSPECT PATIO DOOR

• Cosmetic damage
• Product squareness (diagonal measurements must be within

1/4" difference).

• Correct product (size, color, grid pattern, handing, glazing, energy-

efficiency requirements, etc.).

• Splits, cracks, holes, missing sections or other damage to the nailing

fin longer than 6" and/or within 1/2" of patio door frame.

• For side-by-side mulled units only, a drip cap may be pre-installed. If

not pre-installed, see Needed Materials list above for details.

• Included parts (See Provided Materials above)
If any of the above conditions represent a concern, or if you expect

environmental conditions to exceed the patio door’s performance

rating, do not install the patio door. Contact your dealer or distributor

for recommendations.

The sill can be prepared using one of two methods: We recommend
SureSill

Sloped Sill Pan

available from SureSill at www.suresill.com,

building supply stores, and some manufacturing locations. As an
alternative, a sill pan can be fabricated on site, by following the
instructions below. If installing a SureSill

sill pan, follow SureSill

’s

instructions for installation and skip to section 4 “PREPARE
STUD-FRAMED WALL“.

JOBSITE FABRICATED SILL PAN

1. Cut a piece of sheet

material to the
length shown.

2. Lightly crease folding

lines 1/2" in from the
two short sides and
one long side.

3. Measure the width

of the frame and
add 9/16".

4. Take this distance

from the back edge
and lightly crease a
folding line across
the sheet material.

5. For step-down

landings, cut 1/2" in
at this line on both sides of the sheet material.

6. For continuous

slab, cut across the
folding line.

7. Fold the three back

sides up to make a
3-sided box, and,
for step-down
landings, fold the
front flap down.

Frame

width

+9/16"

Folding Line

Length of rough opening sill plus 1"

1/2"

1/2"

Fold sides and back up

Fold corner

forward

Fold front

flap down

Remove for

continuous slab

Measure

frame

width

Interior

REMOVE PACKAGING AND INSPECT WINDOW

INSPECT ROUGH OPENING

INSTALL SILL PAN

1

2

3