JELD-WEN JII027 Wood Patio Doors without Exterior Trim or Nailing Fin User Manual

Page 2

Advertising
background image

INSTALLATION INSTRUCTIONS

for Wood Patio Doors without Exterior Trim or Nailing Fin (JII027)

2

FULLY SHEATHED WALL CONSTRUCTION

The wall framing is covered

by sheathing and the door

will be mounted inside of

the rough opening. This

installation assumes building

wrap is properly installed

prior to installation.

OPEN-STUD CONSTRUCTION

The wall framing is not covered by sheathing.

This installation guide specifically addresses masonry/block wall,

sheathed wall and open-stud construction.

MASONRY/BLOCK WALL CONSTRUCTION

This installation assumes

that a building professional

has already properly

fastened and sealed a

framework of studs (often

called a buck) to the

concrete/masonry wall.

MATERIALS

• #10 x 3" pan head corrosion-resistant screws. Fasteners must

penetrate at least 1" into framing.

• 3/16" x 2 1/2" self-tapping concrete screws (for concrete subfloors)
• Non water degradable or compressible shims
• 4", 6", or 9" (as required by local code and window configuration)

wide self-adhesive flashing: We recommend OSI

®

QUAD

®

Butyl

Flashing Tape or equivalent.

• Spray adhesive/primer for self adhesive flashing. Such as Loctite

®

300

or equivalent

• Sealant: We recommend OSI

®

QUAD

®

Max Sealant or equivalent. This

can be used in any application and can be painted or ordered in a
color matched product, if desired.

• Polyurethane low expansion Window and Door foam: We recommend

OSI

®

QUAD

®

Foam or equivalent).

• Plastic drain screen with crisscross or woven pattern (sold in 6" widths

to protect rain gutters) for step-down landings

• Sheet metal flashing or bendable vinyl sheeting for sill pan (6" wide

for 2" x 4" wall)

• 3/8" staples for step-down landings

Note!

Follow all material manufacturers’ instructions for proper use

and compatibility.

NEEDED MATERIALS & TOOLS

TOOLS

• Cutting shears (sill pan)
• Tape measure
• Utility knife
• Level (4' minimum

recommended)

• J-roller
• Caulking gun
• Hammer/drill
• Construction stapler
• Flat head screwdriver

SAFETY

• Read and fully understand ALL manufacturers’ instructions

before beginning.

• Do not work alone. Two or more people are required. Use safe

lifting techniques.

• Use caution when handling glass. Broken or cracked glass can cause

serious injury.

• Wear protective gear (e.g. safety glasses, gloves, ear protection, etc.).
• Operate hand/power tools safely and follow manufacturer’s

operating instructions.

• Use caution when working at elevated heights.

SAFETY & HANDLING

MATERIALS & PATIO DOOR HANDLING

• Make sure the operating panel is secured prior to installation.
• Heed material manufacturers’ handling and application instructions.
• Protect adhesive surfaces from dirt, moisture, direct sunlight and

folding over onto themselves.

• Handle in vertical position; do not drag on floor.
• Do not put stress on joints, corners or frames.
• Store patio door in dry, well-ventilated area in vertical, leaning

position to allow air circulation; do not stack horizontally.

• Protect from exposure to direct sunlight during storage.
• Install only into vertical walls and when conditions and sheathing

are dry.

IF INJURY OCCURS, IMMEDIATELY SEEK MEDICAL ATTENTION!

ROUGH OPENINGS

Buck

Trimmer

studs

Header

Sheathing

Sill area

King

stud

Advertising