Thunderbird rack & pinion system – Flaming River Thunderbird Rack & Pinion Cradle Kits 1955-57 User Manual

Page 12

Advertising
background image

Thunderbird Rack & Pinion System

Page 11 of 13

Flaming River Ind. 800-648-8022

Modified on 02/06/08

JJ/RD/BC

Universal Joint System.

1) Install support-bearing mount onto the cradle mounting bolt. (Picture below). Note: The angle of this

mount is set for most applications. Some adjustment may be necessary for the correct angle and u-
joint alignment.

2) We recommend the use of ¾” wood dowel rod to mock up the steering shaft to obtain the correct

length of the shafts.

3) Install your shaft kit and snug each set screw so that it will leave a mark in the shafts.

4) Remove shaft and dimple each setscrew mark using a ¼” drill bit. (As shown below.)

5)

Re-install the shafts using red loc-tite thread locker on the set screw threads. Tighten each setscrew to 25 ft. lbs. Tighten
all lock nuts securely. We recommend that you Inspect setscrews periodically for tightness.



Advertising