AMX NetLinx Integrated Controllers NXI-x000 Series User Manual

Page 24

Advertising
background image

Installation and Upgrading

20

NI-2000, NI-3000, NI-4000 Hardware Reference Guide

3.

Thread the cables through the opening in the equipment rack. Allow for enough slack in the cables
to accommodate for movement during the installation process.

4.

Reconnect all cables to their appropriate source/terminal locations. Refer to theConnections and
Wiring
section on page 19 for more
detailed wiring and connection information.

Verify that the terminal end of the power cable is not connected to the a power supply before
plugging in the 2-pin power connector.

5.

Slide the unit into the rack until the attachment holes, along both sides, align to their corresponding
locations on the mounting brackets, as shown in FIG. 5.

6.

Secure the AC-RK to the rack by using the four #10-32 screws (80-0186) and four #10 washers
(80-0342) supplied in the kit.

7.

Apply power to the unit to complete the installation.

FIG. 5

Mounting Integrated Controller into an equipment rack

Install screws

Bracket

Rack
Mounting Holes

To prevent repetition of the installation, test the incoming wiring by connecting the
Controller’s connectors to their terminal locations and applying power. Verify that the
unit is receiving power and functioning properly. Disconnect the terminal end of the
power cable from the connected 12 VDC-compliant power supply.

Advertising