Trolley guide installation – Alto-Shaam Processing Freezer/Chiller/Refrigeration System QC-3/QC-20/QC-40/QC-50/QC-50 Remote/QC-100/Qc-100 Remote User Manual

Page 7

Advertising
background image

QUICKCHILLER • INSTALLATION/OPERATION/SERVICE MANUAL • 5.

S I T E I N S T A L L A T I O N

I N S T A L L A T I O N

Trolley Guide Installation

1. Align each guide rail with the holes located under

the cabinet.

2. Loosely fasten each guide rail with a washer, lock washer

and bolt.

3. Push the roll-in cart (trolley) into the Quickchiller, center

the cart right-to-left, and close the door.

4. Slide both guide rails toward the center of the

Quickchiller until they make contact with the roll-in cart.

Lock the guide rails into position by tightening the bolts.

At the front of the Quickchiller, make certain contact

has been made between the Quickchiller and the cart

along the total width of the door to create a complete

seal. When a full seal has been determined, recheck each

connection to make certain it has been fully tightened.

TROLLEY GUIDE INSTALLATION

Advertising