Rack-mount to tower conversion procedure – American Power Conversion 5000VA User Manual

Page 8

Advertising
background image

4

Smart-UPS 5000 VA 208/230 Vac Tower/Rack-Mount 5U User Manual

Rack-mount to tower conversion procedure

The UPS and the battery modules are heavy. Remove the battery modules to lighten the UPS during

installation. Refer to the battery removal instructions on the packaging.

Install stabilizer brackets

Stand the UPS on the side with the embossed marks.
Secure a stabilizer bracket (supplied), to both sides of the UPS.
Secure each bracket with two pan head locking screws (supplied).

Install two top covers

Install the large top cover by placing it in the

slots on the UPS and sliding the cover

forward.
Install the small top cover by placing it in the

slots on the UPS and sliding the cover

forward.
Secure the top covers with a #8 black screw

(supplied).

4x

2x

2x

Close and secure the battery doors

Foam spacers

Install batteries

Connect only the first two batteries in the string of three batteries. Be sure that the battery

connectors are fully engages.
Do not connect the single battery or the last battery installed in the string of three batteries.

Advertising