Chapter 10, Verifying the hardware operations of the chassis – Allied Telesis AT-SBx81CFC960 User Manual
Page 209
Advertising

209
Chapter 10
Verifying the Hardware Operations of
the Chassis
This chapter describes how to verify the operations of the chassis. The
chapter contains the following sections:
“Using the LEDs to Verify the Chassis” on page 210
“Using Local Management to Verify the Chassis” on page 212
Note
Allied Telesis recommends using both methods to confirm the initial
operations of the chassis, controller cards, and line cards.
Advertising
This manual is related to the following products: