Installing the at-stackxg stacking module – Allied Telesis AT-9448Ts/XP (Basic Layer 3) User Manual

Page 39

Advertising
background image

AT-9400Ts Stack Installation Guide

39

Installing the AT-StackXG Stacking Module

This procedure contains the installation instructions for the AT-StackXG
Stacking Module. The module must be installed in all of the switches of the
stack. It is generally easier to install the module before a switch is mounted
in the equipment rack.

Note

Although the stacking module can be hot-swapped, meaning that it
can be installed while the switch is powered on, Allied Telesis
recommends that the switches be powered off during the initial
installation of the stack.

Warning
The module can be damaged by static electricity. Be sure to observe
all standard electrostatic discharge (ESD) precautions, such as
wearing an antistatic wrist strap, to avoid damaging the device.

To install the AT-StackXG Stacking Module in the switch, perform the
following procedure:

1. Remove the blank panel from the expansion slot on the back panel of

the switch by loosening the two captive screws on the panel with a
cross-head screwdriver.

Figure 9. Removing the Blank Panel from the Expansion Slot

1241

AT-LX44CPUCV

R

Advertising
This manual is related to the following products: